Unit 1B, Keynor Farm
Sidlesham, PO20 7LL
8:30am - 5:00pm
Monday - 4:00pm Friday
The National Grid Electricity System Operator (NGESO), along with the Energy Networks Association (ENA), Distribution Network Operators (DNO), and Independent Distribution Operators (IDNO) introduced the ALoMCP to improve grid stability & safety. Non-domestic generators that were connected before 1st February 2018 may need to upgrade their hardware to comply with the Distribution Code. The ALoCMP […]
In this blog we will be looking at some of the FAQs surrounding grid-tied battery storage systems installed alongside Solar. How Does Battery Storage Work? Battery storage is simply a way of storing surplus energy produced by a renewable energy source. Most commonly storage is use in conjunction with solar PV, this will form the […]
We’re passionate about our climate. It’s a key part of why we push and drive forward a future powered by renewable energy. Some of you may have seen a programme on BBC featuring everyone’s favourite national legend Sir David Attenborough. It’s a programme all about climate change, based on facts. We wanted to share it […]
Website designed and developed by Vinco Marketing