System Size; 4.27kW
Cost; £9298
Projected annual generation; 3724kWh
Projected annual Co2 Savings; 1721kg
Projected energy savings; £352
Projected tariff (FIT) income; N/A
Projected export income; £0
Projected annual savings; £352
This installation was a slightly more complicated job. To make the most of all available roof space the 14 JA 305W full black modules were mounted across 6 different roof faces. Because not all of these roof faces were south facing Tigo optimisation was used to ensure that no generation was lost.
The modules were mounted using our TRIC mounting systems, 4 of the modules were mounted individually, with another 2 in a column, and the rest mounted on a south facing roof.
The modules all fed into a GoodWe Hybrid inverter, with added Pylontech batteries. A total of 3 batteries were installed equating to 7.2kWh of storage capacity.