System Size; 4.56kW
Cost; £4892
Projected annual generation; 4705kWh
Projected annual Co2 Savings; 2175kg
Projected energy savings; £352
Estimated export income; £103
Estimated annual savings; £456 (for first 20 years)
This installation for Aldwick Parish Council was installed to help reduce the running costs of the building, and help the parish council reduce their carbon footprint. Using JA Solar 380W black modules, this system totals 4.56kWp. Generating enough power to help offset the buildings electricity consumption. To assist this we also installed a PowerFlow immersion controller. This diverts surplus energy to heat water in an immersion tank.