Unit 1B, Keynor Farm
Sidlesham, PO20 7LL
8:30am - 5:00pm
Monday - 4:00pm Friday
A full renewable domestic solution installed in Stubbington, Hampshire.
The first part of this installation was an LED lighting swap out, all the old filament bulbs were removed and new low power energy efficient LED lighting was installed throughout the property.
The second part of this project was the installation of a 3.9kW solar PV array, integrated with a LG Chem battery storage system. To increase self-consumption and reduce energy bills even further a PowerFlow ERS unit was added to the system allowing excess energy to be diverted to heat water through the existing immersion tank.
Website designed and developed by Vinco Marketing